Taylor Rd Culvert

The Project

In 2013 MAREX was contracted by the City of Abbotsford for an emergency repair of a failing culvert beneath Taylor Road.  Work consisted of temporary diversion of the existing creek flows, excavation to a depth of 45’ below grade, removal & replacement of the existing 1350mm culvert, steep slope stabilization, and habitat & road restorations.